NSJ Gold Corp. has an option to acquire 100% of The Golden Hills Project
Located along The Walker Lane Gold Trend, the property is 21 miles northeast of the Copperstone Mine, 100 miles south of the Moss Mine, and 130 miles southwest from the Kay Mine
The project is located 200 miles from Las Vegas, and 130 miles from Phoenix
The Walker Lane gold belt has historically produced over 50 million ounces of gold and 400 million ounces of silver
The Property consists of 7 patented claims and 114 unpatented mining claims covering a total of 2,370 acres (9.6 km2).
Historic Drilling in 2010 and 2011 discovered high grade gold/copper mineralization by hole LB1010 which contained:
15 feet (4.6m) averaging 0.25 oz/ton (7.8 g/t) (including 5 feet (1.5m) averaging 0.59 oz/ton (18.4 g/t))
In addition the hole contained 95 feet (29m) averaging 1.13% copper between 10 and 105 feet depth including 15 feet (4.6m) averaging 4.41% copper
Initial gold recovery using gravity separation yielded 89.3% recovery and formed a concentrate that assayed 2,477 g/t
Further gold extraction using cyanide yielded 99.6% total gold recovery, and copper recovery via acid leach was 70.1% with moderate acid consumption
Drilling completed in May 2021, by NSJ, discovered high grade gold/copper mineralization in Hole GH-2109 which contained:
7.93 g/t Gold and 1.61% Copper Over 4.57 Meters From Near Surface
Two intercepts totaling 10.7 meters (35 feet) averaging over 1.5% copper were also encountered.
Join our mailing list for the most up to date press releases!
Copyright 2020 NSJ GOLD CORP. All Rights Reserved
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.